PLN bills keep climbing and the blackouts keep coming. We design and install solar systems for villas and homes across south Bali — from load calculation to turnkey handover — with Tier-1 panels that pay for themselves in 4–6 years.
From a single solar water heater to full off-grid independence. Designed from your real consumption, installed turnkey, maintained for the long run.
Grid-tied rooftop systems for villas and homes. 5 kWp installed from IDR 65,000,000.
Learn more →
Power through blackouts with hybrid inverters and LiFePO4 batteries. Full independence available.
Learn more →
LiFePO4 home batteries from IDR 25,000,000 for 5 kWh — backup through every blackout.
Learn more →
150–300 litre rooftop systems from IDR 9,500,000 — hot water without the PLN bill.
Learn more →
Independent engineering: load audit, kWp sizing, equipment spec and payback model in IDR.
Learn more →
Deionised-water cleaning with before/after output checks. From IDR 500,000 per visit.
Learn more →
Growatt, Deye and SMA diagnostics, error codes and swap-outs. Same-week service.
Learn more →
20–200 kWp rooftop systems for hotels, resorts and restaurants — payback under 5 years.
Learn more →Pick the assessment type, a day and a window — a complete WhatsApp message opens, and we verify the slot within minutes.
Free of any prepayment — WhatsApp launches with the request composed. Our confirmation and quote follow directly.
Engineering before hardware: we measure your consumption first, then build the system the numbers support — not the biggest one the roof can hold.
Every system starts from your PLN bills and a real load profile — sized for your consumption, never for a sales target.
Tier-1 modules with 10-year product and 25-year performance warranties, honoured locally by our own team.
Export-import metering, SLO certification, submissions and follow-up — we chase the process so you never queue at a PLN office.
Send your PLN bill and roof photos — most projects get a system size and price range the same day, before any visit.
Costs, payback, blackouts and what the PLN rules actually mean.
A Bali villa running four air-conditioners, a pool pump and a water heater pulls 30–60 kWh a day, mostly in daylight — which is exactly when a rooftop system produces. A 5 kWp grid-tied system in Canggu or Ubud generates roughly 6,500–7,500 kWh a year and typically cuts a villa's PLN bill by 40–60%; with a battery it also keeps the router, lights and fridge alive during the outages that hit every month. We size systems from your actual PLN bill and roof orientation, use tier-1 panels with 25-year output warranties and inverters with local service, and handle the PLN net-metering paperwork. Installation takes two to three days; the quote is fixed before the first panel goes up.