Berawa has quietly become one of the most rewarding places on the island to design solar. The villas going up between Finns and the Munggu back roads are newer and bigger than the older Canggu stock — three and four bedrooms, each with its own AC unit, family pools, often a dedicated office for remote work. That last detail matters: when your income depends on a video call, a Berawa afternoon blackout is not an inconvenience, it is a work stoppage. Most of our Berawa clients arrive at solar through exactly that frustration, and leave with a hybrid system that makes the grid optional for the hours that matter.

What We Install Most in Berawa

Hybrid Systems

Panels plus LiFePO4 battery — the WiFi, office and fridge never notice the street going dark. Full details →

Solar Panel Installation

New Berawa builds have clean, modern roofs that take 6–10 kWp arrays beautifully. Full details →

System Design First

Building in Berawa? Designing solar into the build saves 10–15% versus retrofitting after. Full details →

Solar Water Heaters

Family villas burn hot water — a 300 L rooftop system erases that slice of the bill. Full details →

Building in Berawa? Design Solar In

A striking share of our Berawa enquiries come from owners mid-construction, and they get the best outcomes on the island. Specifying solar during the build means conduit runs cast into the structure, an inverter room with real ventilation, a roof structure engineered for the array from day one, and a distribution board already split for essential loads — collectively 10–15% cheaper than retrofitting, with a cleaner result. Our design and load calculation service works directly with your architect or contractor. For finished villas, the standard Berawa package mirrors Canggu next door: 5–8 kWp hybrid with 10 kWh of storage from around IDR 95,000,000, surveyed within the week — Berawa sits in the middle of our densest service area, between Canggu and Seminyak.

Frequently Asked Questions — Berawa

Do you cover all of Berawa?
Yes — from Finns and the beach side through Padonan and Tibubeneng to the Munggu back roads. Berawa sits at the centre of our busiest corridor, so surveys typically happen within the week.
Can you install solar while my villa is still being built?
Yes, and it is the cheapest moment to do it. We coordinate with your contractor on conduits, roof loading and the electrical room, then install and commission near handover. Start with the design service.
Are blackouts in Berawa as bad as Canggu?
Berawa shares the same feeders, so yes — wet-season outages hit both alike. That is why most Berawa systems we build are hybrids with battery backup rather than plain grid-tie.
What does a typical Berawa system cost?
A 5 kWp grid-tied system from IDR 65,000,000; the more popular hybrid with 10 kWh battery from IDR 95,000,000. Full tables on the pricing page — no area surcharge.

Nearby Areas We Also Cover

Solar for Your Berawa Villa?

Built or still building — WhatsApp your plans or PLN bill and get a same-day recommendation.

WhatsApp Us from Berawa